Using Appointments
Draft guidance · pending workflow review
Summary: Reserve time for work and compare the plan with what was actually done.
An appointment allocates work to a person or role for a time period. A task describes the work; an assignment identifies responsibility; a worklog records actual time. Keep these distinctions when planning and reviewing progress.
Dependencies
Confirm the task, program role or person, dates, and duration before booking time. Where a named person is needed, complete the program role and membership setup and check the intended participant.
The task's workflow must support scheduling. If the application reports “Scheduled functionality is not allowed in current workflow,” have the program owner check that workflow and task type. Changing the calendar view will not resolve the restriction.
Ordinary appointment controls restrict appointments in the past, changes on closed tasks, and appointments for banned users. A timed appointment cannot exceed 24 hours. Check the actual date, time, and duration before saving. Follow the configured workflow requirements for the intended action.
Dependency tree
Complete the booking conditions before relying on an appointment. The timer branch applies when closing an existing appointment.
- Book an appointment
- Close an appointment
Choose the scheduling context
Open Schedule, Reschedule, or the task's Time tab. The Schedule panel offers Me, Assigned, Program, and Everyone contexts where available. Program view can group by roles, people, or teams. The panel exposes Week and 6 weeks views where applicable.
Select the relevant Program and period. Expand the person or role whose allocation you need to inspect. Check that you are reading the intended calendar and time zone.
Create an appointment
Use the available appointment creation action, a supported task drop onto a calendar, or a time block in the task's scheduling controls.
- Confirm the Program and parent task.
- Choose the person or role the appointment is for.
- Check the date, start time or period, and reserved duration.
- Resolve any required role or rate prompt using the approved Program setup.
- Save and wait for the update.
- Open the resulting appointment to verify its details and workflow state.
If a control applies to All assignees, inspect the resulting allocations for each person. Do not assume a single shared hour has been divided among them.
Move or cancel a booking
Open the appointment and inspect its available workflow actions. Supported dragging and editing remain subject to permissions, workflow state, related time entries, and period restrictions. Confirm the result after a move.
If a change is rejected, read the explanation before trying another route. A forecast or period lock can deliberately preserve an agreed plan. Use the supported cancellation or replacement process with the responsible manager when required.
Compare plan and actual work
Use appointments for planned time and worklogs for actual time. Review differences to improve future estimates and staffing. A full calendar is not evidence that its work was completed.
When an appointment does not appear immediately, check the selected person, dates, and filters, then reload. Inspect the task's Time tab before creating another booking so you do not duplicate it.
Before closing an appointment
An appointment with an active timer cannot be closed. Stop and review the timer when work ends, then retry the authorized closing action and inspect the result.
If a work entry needs correction, follow Record and Correct Work Time. Closing an appointment and correcting actual work are separate actions with different state and period requirements.
From a booking to recorded actual work
In the Northstar example, Maya reserves time to check the request form and later records the time she actually used. The booking and work entry remain separate records.
- Complete the appointment dependencies, then create the booking for the intended task, person or role, dates, and duration.
- Reopen the appointment and inspect those details and its state. If it is missing, check the calendar context and task's Time tab before creating a duplicate.
- When work occurs, follow Record and Correct Work Time. For example, after thirty minutes of actual checking, enter
30mwith a description of the result. Do not copy a reserved duration without checking actual effort. - Inspect the saved work entry and the task's Time tab. Compare actual effort with the booking; a difference can be legitimate.
- If closing the appointment, first stop and review any active timer and use the permitted closing action. Review the actual entries on the correct Timecard separately.
Result: The booking shows the intended plan, the worklog shows actual effort, and the relevant timecard includes the actual entry for review. Appointment closure does not itself accept the task or approve the timecard.