Set Up an Instance and Organization
Follow the Instance Setup Dependency Order
Draft guidance · checked against application source; instance walkthrough pending
Summary: See what must exist before each setup action, which branches can proceed together, and what proves a step is complete.
The menu is a directory of controls, not a setup sequence. Start from the action you need to enable and work backward through its prerequisites. Some branches can be prepared together, but they must meet at specific points before the next action succeeds.
This sequence combines inspected application rules with the signed-in practice checks already recorded for Runcible. Account-approval requirements and available workflows remain instance-specific. A complete setup from a newly provisioned instance has not yet been verified by this guide.
1. Confirm the starting point
Identify the database instance, whether it is shared or dedicated, and the organization being configured within it. Confirm that the database is initialized and the intended organization context is available, with an authorized person able to maintain it. Instances, Organizations, and User Accounts explains these separate prerequisites. Inspect existing organization versions, capabilities, work roles, rate sets, and workflows before creating anything. Provisioning can supply starting records; their existence does not establish that they match this team's operating choices.
If there is no authorized person who can configure the instance, resolve that first. Ordinary contributor onboarding is not the procedure for establishing the first setup administrator. Use My Instances and the responsible provisioning specialist to establish the starting point.
2. Prepare the branches that do not require program membership
These branches can progress together once their own authority and reference choices are available:
- Organization: establish the current version and intended units. These supply placement choices for people and programs. Follow Prepare the Organization Before Placing People and Programs.
- Access: confirm the capability roles and record-grant approach for setup and later work. Follow Access-role configuration.
- Work definitions: confirm active work roles, the relevant currency, rate sets, and approved role-rate values. Follow Work roles and rates.
- People: identify the system-wide user account and establish the appropriate local account and membership, then complete the staffing information and approval required in the intended organization. A personal rate belongs to an existing person; its requirement before staffing approval does not mean it must exist before the person's record can be created. Follow Configure a New User Account.
- Company and workflow choices: confirm the company and prospective program manager. Review task workflows appropriate to the intended program type and organization placement. Follow Adding a New Program and Choosing a Workflow.
Checkpoint: The relevant definitions and records exist and can be selected. A defined work role, an access role, a personal rate, and a program rate are different prerequisites.
3. Meet the requirements for saving a program
Before saving the program, resolve these choices:
- Save the intended program
- Company record available
- Program manager account available
- Name, company-specific key, and start date supplied
- Base Rate Set selected
- Program Type and intended organization placement selected
The program form uses Program Type and organization placement when offering Task Workflow choices. Establish those selections before deciding that the desired workflow is missing. Restricted program-creation forms can supply company, manager, or rate-set defaults; check the resulting saved values rather than assuming the full form appears for every account.
Checkpoint: Reopen the program and verify its company, manager, type, placement, Base Rate Set, and task workflow. A saved program is the start of membership setup, not proof that people are assignable.
4. Establish a usable rate source before adding program members
A program role needs a saved default rate before a person can be added under it. For the program-base route, the sequence is:
- Active work role and an active rate for it in the selected Base Rate Set
- Saved program uses that Base Rate Set
- Members → Add Role offers the intended role
- Choose and save the program role's default rate
- Add the intended person under that role
- Inspect the member's copied rate and completion
- Verify the person and role in the task's Assignee chooser
If using a contract rate, the contract branch joins before the program-role rate can use it: prepare the company, required billing choices, and rate set; save the contract; link it to a program for the same company; then select its applicable role rate. See Contracts. A contract is conditional on that rate or funding arrangement, not mandatory for every program.
The normal membership setup marks the role and membership complete when a positive hourly rate is saved. A zero or alternative basis needs a supported, agreed setup; do not enter invented charges to force completion. Turning on In Rate Set alone did not make the role usable in the checked interface: its active rate and saved values also mattered.
Checkpoint: The correct person-and-role entry is offered and the intended assignment survives reopening. A membership name alone is not sufficient evidence.
5. Meet the additional requirements for the intended action
To work on the task: the contributor also needs access to the record and the relevant workflow action. Assignment alone does not grant a decision. Parent state, estimates, or other requirements can govern entry into a working state; follow The Task Workflow.
To record actual time: the relevant conditions meet at the work-log action: permission to create the work log in its program, the person's assignment, a working task, the actual work date, a permitting operational period, and any timecard restrictions. Calendar and operational-period setup can proceed earlier in parallel; they must be ready before the date-dependent action is attempted. Follow Record Work Time.
To approve a record: confirm the actual reviewer on that kind of record. The underlying work log and the whole timecard have separate review decisions. A rule that finds a program manager for a work log can fail to find anyone for a record with no related program. Follow Timecard review.
Checkpoint: The intended account performs the action and the saved result is reopened. Completing one branch does not establish that all the other conditions have been met.
Avoid apparent circular requirements
Separate the record's existence from its readiness:
- System-wide identity → local account and membership → local approval and permissions: the person's continuing identity is separate from readiness to work in this organization.
- Person → personal rate → staffing approval: the person's record can exist while its staffing setup is incomplete. Successful login is a separate check.
- Rate set → program → program role → saved role rate → membership: the rate-set definition and the program-role default are separate records. Giving them one label such as “rates configured” hides the order.
- Workflow definition → program selection → representative record → reviewer check: a workflow must be available before selection, but its decision makers must also resolve correctly on real records afterward.
- Existing setup authority → configuration → ordinary participant verification: verify the initial setup authority before onboarding the people whose work depends on those definitions.
If the required record cannot be created until another record points back to it, retain the exact forms and messages for the responsible maintainer. Do not resolve an unexplained cycle by creating fictional financial values or broadening everyone's access.
How to use the order during setup
For the next action, write down four things: must already exist, what you change now, what this enables, and what saved result proves it worked. Link each missing prerequisite to its owning procedure, complete it, then return to the original action.
Use Decide the Instance's Operating Setup to retain unresolved policy choices and Check an Instance Before Team Rollout to verify the full path. This dependency order establishes the initial foundation; the organization sequence expands one branch. Provisioning, organization-version migration, and finance branches still need further verification.